The interXdata warehouse tracks 18 interconnection projects in Palo Alto, Iowa, representing 1,595 MW of requested capacity.

18Total projects
0Active
13Operational
5Withdrawn
1,595 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind101,502 MW
Other790 MW
Gas14 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
MISO Queue Project J529 — Wind in Palo Alto, IowaJ529Wind250.0 MWoperationalPalo Alto, Iowa
Palo Alto Wind Farm63053_PAWFWind250.0 MWoperationalPalo Alto, Iowa
West Queue Project GI-0612a — Wind in Palo Alto, IowaGI-0612aWind200.0 MWwithdrawnPalo Alto, Iowa
PALO ALTO - KOSSUTH COUNTY 345.0kVJ3324Wind200.0 MWoperationalPalo Alto, Iowa
West Queue Project GI-0807a — Wind in Palo Alto, IowaGI-0807aWind200.0 MWwithdrawnPalo Alto, Iowa
West Queue Project GI-0703a — Wind in Palo Alto, IowaGI-0703aWind100.8 MWwithdrawnPalo Alto, Iowa
MISO Queue Project G554 — Wind in Palo Alto, IowaG554Wind100.0 MWwithdrawnPalo Alto, Iowa
MISO Queue Project J590 — Wind in Palo Alto, IowaJ590Wind90.0 MWoperationalPalo Alto, Iowa
Palo Alto Wind Farm63053_PAWF2Wind90.0 MWoperationalPalo Alto, Iowa
MISO Queue Project G317 — Other in Palo Alto, IowaG317Other80.0 MWwithdrawnPalo Alto, Iowa
Crosswind Energy Project56859_1Wind21.0 MWoperationalPalo Alto, Iowa
Poet Bioprocessing Emmetsburg68066_1Gas3.5 MWoperationalPalo Alto, Iowa
West Bend1199_5Other2.5 MWoperationalPalo Alto, Iowa
West Bend1199_4Other2.2 MWoperationalPalo Alto, Iowa
Graettinger1142_6Other2.0 MWoperationalPalo Alto, Iowa
Graettinger1142_5Other1.1 MWoperationalPalo Alto, Iowa
West Bend1199_1Other1.1 MWoperationalPalo Alto, Iowa
West Bend1199_3Other0.9 MWoperationalPalo Alto, Iowa

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Palo Alto County.

Start tracking with interXdata