Winneshiek County, Iowa — Interconnection Projects
The interXdata warehouse tracks 3 interconnection projects in Winneshiek, Iowa, representing 6 MW of requested capacity.
3Total projects
0Active
3Operational
0Withdrawn
6 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Battery | 1 | 2 MW |
| Wind | 1 | 2 MW |
| Solar | 1 | 2 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Decorah Battery | 64375_BESS1 | Battery | 2.5 MW | operational | Winneshiek, Iowa |
| Luther College Wind Project | 58407_WTG01 | Wind | 1.6 MW | operational | Winneshiek, Iowa |
| DPC Madison | 67795_PV1 | Solar | 1.5 MW | operational | Winneshiek, Iowa |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.