The interXdata warehouse tracks 5 interconnection projects in Decatur, Kansas, representing 676 MW of requested capacity.
5Total projects
1Active
2Operational
2Withdrawn
676 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 3 | 670 MW |
| Other | 2 | 6 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Tap of Mingo - Red Willow 345 kV Line | GEN-2022-015 | Solar | 270.0 MW | active | Decatur, Kansas |
| Tap of Mingo--Red Willow 345kV line | GEN-2022-026 | Solar | 200.0 MW | withdrawn | Decatur, Kansas |
| Tap of Mingo--Red Willow 345kV line | GEN-2022-025 | Solar | 200.0 MW | withdrawn | Decatur, Kansas |
| Oberlin (KS) | 1312_8 | Other | 3.0 MW | operational | Decatur, Kansas |
| Oberlin (KS) | 1312_7 | Other | 3.0 MW | operational | Decatur, Kansas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.