Gray County, Kansas — Interconnection Projects
The interXdata warehouse tracks 9 interconnection projects in Gray, Kansas, representing 1,201 MW of requested capacity.
9Total projects
0Active
4Operational
5Withdrawn
1,201 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 6 | 671 MW |
| Solar | 3 | 530 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Buckner 345kV Substation | GEN-2022-203 | Solar | 200.0 MW | withdrawn | Gray, Kansas |
| Ingalls 115 kV Substation | GEN-2024-093 | Solar | 180.0 MW | withdrawn | Gray, Kansas |
| Cimarron Wind Energy LLC | 57762_CPV1 | Wind | 165.6 MW | operational | Gray, Kansas |
| Santa Fe 115 kV Substation | GEN-2024-030 | Solar | 150.0 MW | withdrawn | Gray, Kansas |
| Ingalls 115 kV Substation | GEN-2024-097 | Wind | 150.0 MW | withdrawn | Gray, Kansas |
| Cimarron Windpower II | 57663_1 | Wind | 131.0 MW | operational | Gray, Kansas |
| Gray County Wind Energy | 55734_V47 | Wind | 112.2 MW | operational | Gray, Kansas |
| Ensign Wind LLC | 58137_1 | Wind | 98.9 MW | operational | Gray, Kansas |
| Gray County 115kV | GEN-2019-079 | Wind | 13.0 MW | withdrawn | Gray, Kansas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Gray County.
Start tracking with interXdata