Thomas County, Kansas — Interconnection Projects

The interXdata warehouse tracks 13 interconnection projects in Thomas, Kansas, representing 683 MW of requested capacity.

13Total projects
0Active
11Operational
1Withdrawn
683 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind3545 MW
Other8121 MW
Gas116 MW
Solar11 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Solomon Forks Wind Project, LLC61984_WTGSWind275.6 MWoperationalThomas, Kansas
East Fork Wind Project, LLC62220_WTGSWind195.8 MWoperationalThomas, Kansas
Colby 115kVGEN-2012-026Other100.0 MWwithdrawnThomas, Kansas
Mingo 345kVGEN-2016-067Wind73.6 MWoperationalThomas, Kansas
Colby1225_GT1Gas16.0 MWoperationalThomas, Kansas
Colby City of1272_7Other4.5 MWoperationalThomas, Kansas
Colby City of1272_6Other4.5 MWoperationalThomas, Kansas
Colby City of1272_3AOther3.0 MWoperationalThomas, Kansas
Colby City of1272_9Other3.0 MWoperationalThomas, Kansas
Colby City of1272_8Other2.7 MWoperationalThomas, Kansas
Colby City of1272_4Other1.7 MWoperationalThomas, Kansas
Colby City of1272_5Other1.3 MWsuspendedThomas, Kansas
Midwest Energy Community Solar Array59632_1036Solar1.0 MWoperationalThomas, Kansas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Thomas County.

Start tracking with interXdata