Livingston County, Louisiana — Interconnection Projects

The interXdata warehouse tracks 4 interconnection projects in Livingston, Louisiana, representing 2,418 MW of requested capacity.

4Total projects
0Active
0Operational
4Withdrawn
2,418 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas11,500 MW
Battery1500 MW
Solar2418 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
COLYJ4071Gas1,500.0 MWwithdrawnLivingston, Louisiana
COLY - WILLOW GLEN 500 SWYD 500.0kVJ4100Battery500.0 MWwithdrawnLivingston, Louisiana
Hammond - Coly 230 kVJ1538Solar268.0 MWwithdrawnLivingston, Louisiana
Independence (6INDEPD)J2077Solar150.0 MWwithdrawnLivingston, Louisiana

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.