Chickasaw County, Mississippi — Interconnection Projects

The interXdata warehouse tracks 15 interconnection projects in Chickasaw, Mississippi, representing 1,702 MW of requested capacity.

15Total projects
3Active
2Operational
10Withdrawn
1,702 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar111,305 MW
Solar+Battery2250 MW
Battery1145 MW
Gas12 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Southeast Queue Project 585 — Solar in Chickasaw, Mississippi585Solar220.0 MWwithdrawnChickasaw, Mississippi
Southeast Queue Project 463 — Solar in Chickasaw, Mississippi463Solar200.0 MWwithdrawnChickasaw, Mississippi
Southeast Queue Project 539 — Solar+Battery in Chickasaw, Mississippi539Solar+Battery200.0 MWwithdrawnChickasaw, Mississippi
Southeast Queue Project 368 — Solar in Chickasaw, Mississippi368Solar175.0 MWwithdrawnChickasaw, Mississippi
MS Queue Project 425 — Solar in Chickasaw, Mississippi425Solar150.0 MWactiveChickasaw, Mississippi
Southeast Queue Project 540 — Solar in Chickasaw, Mississippi540Solar150.0 MWwithdrawnChickasaw, Mississippi
MS Queue Project SP-002 — Battery in Chickasaw, MississippiSP-002Battery145.0 MWactiveChickasaw, Mississippi
MS Queue Project 422 — Solar in Chickasaw, Mississippi422Solar145.0 MWactiveChickasaw, Mississippi
Southeast Queue Project 664 — Solar in Chickasaw, Mississippi664Solar100.0 MWwithdrawnChickasaw, Mississippi
Southeast Queue Project 504 — Solar in Chickasaw, Mississippi504Solar70.0 MWwithdrawnChickasaw, Mississippi
Southeast Queue Project 343 — Solar in Chickasaw, Mississippi343Solar52.0 MWwithdrawnChickasaw, Mississippi
Southeast Queue Project 532 — Solar+Battery in Chickasaw, Mississippi532Solar+Battery50.0 MWwithdrawnChickasaw, Mississippi
Southeast Queue Project 348 — Solar in Chickasaw, Mississippi348Solar40.0 MWwithdrawnChickasaw, Mississippi
SR Houston60853_HOUSTSolar3.1 MWoperationalChickasaw, Mississippi
Prairie Bluff57408_GEN1Gas1.6 MWoperationalChickasaw, Mississippi

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; tva-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Chickasaw County.

Start tracking with interXdata