Covington County, Mississippi — Interconnection Projects

The interXdata warehouse tracks 3 interconnection projects in Covington, Mississippi, representing 526 MW of requested capacity.

3Total projects
1Active
0Operational
2Withdrawn
526 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar2376 MW
Battery1150 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Southwest Lone Star 161 kV - Mississippi Hub 161 kVJ2971Solar280.0 MWwithdrawnCovington, Mississippi
Southwest Lone Star 161 - Mississippi Hub 161.0kVJ4107Battery150.0 MWwithdrawnCovington, Mississippi
Covington (MS)65293_OEMS4Solar96.0 MWactiveCovington, Mississippi

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Covington County.

Start tracking with interXdata