Covington County, Mississippi — Interconnection Projects
The interXdata warehouse tracks 3 interconnection projects in Covington, Mississippi, representing 526 MW of requested capacity.
3Total projects
1Active
0Operational
2Withdrawn
526 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 376 MW |
| Battery | 1 | 150 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Southwest Lone Star 161 kV - Mississippi Hub 161 kV | J2971 | Solar | 280.0 MW | withdrawn | Covington, Mississippi |
| Southwest Lone Star 161 - Mississippi Hub 161.0kV | J4107 | Battery | 150.0 MW | withdrawn | Covington, Mississippi |
| Covington (MS) | 65293_OEMS4 | Solar | 96.0 MW | active | Covington, Mississippi |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27