Lamar County, Mississippi — Interconnection Projects
The interXdata warehouse tracks 7 interconnection projects in Lamar, Mississippi, representing 946 MW of requested capacity.
7Total projects
1Active
5Operational
1Withdrawn
946 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 2 | 558 MW |
| Solar | 5 | 388 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| R D Morrow | 6061_MOR2 | Gas | 402.0 MW | operational | Lamar, Mississippi |
| Columbia to Plant Morrow 161kV | J2321 | Solar | 180.0 MW | withdrawn | Lamar, Mississippi |
| R D Morrow | 6061_MOR1 | Gas | 156.0 MW | operational | Lamar, Mississippi |
| Sumrall I Solar Farm | 60306_SUM1 | Solar | 52.0 MW | operational | Lamar, Mississippi |
| Sumrall II Solar Farm | 60303_SUM2 | Solar | 52.0 MW | operational | Lamar, Mississippi |
| MISO Queue Project J791 — Solar in Lamar, Mississippi | J791 | Solar | 52.0 MW | active | Lamar, Mississippi |
| MISO Queue Project J473 — Solar in Lamar, Mississippi | J473 | Solar | 52.0 MW | operational | Lamar, Mississippi |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Lamar County.
Start tracking with interXdata