Leake County, Mississippi — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in Leake, Mississippi, representing 380 MW of requested capacity.
4Total projects
0Active
2Operational
2Withdrawn
380 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 1 | 316 MW |
| Solar | 2 | 62 MW |
| Battery | 1 | 2 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Southeast Queue Project 63 — Other in Leake, Mississippi | 63 | Other | 316.0 MW | withdrawn | Leake, Mississippi |
| Southeast Queue Project 634 — Solar in Leake, Mississippi | 634 | Solar | 61.0 MW | withdrawn | Leake, Mississippi |
| Walnut Grove Demonstration Plant | 65697_1A | Battery | 1.5 MW | operational | Leake, Mississippi |
| Walnut Grove Demonstration Plant | 65697_1B | Solar | 1.5 MW | operational | Leake, Mississippi |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Leake County.
Start tracking with interXdata