Tunica County, Mississippi — Interconnection Projects

The interXdata warehouse tracks 9 interconnection projects in Tunica, Mississippi, representing 1,547 MW of requested capacity.

9Total projects
0Active
2Operational
7Withdrawn
1,547 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar61,200 MW
Wind1177 MW
Battery2170 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
ROBINSONVILLE - TUNICA 230/115 SUB 230.0kVJ2174Solar390.0 MWwithdrawnTunica, Mississippi
Tunica 230 kV (337160)J3261Solar200.0 MWwithdrawnTunica, Mississippi
J866 Six Mile Lake SubstationJ2571Wind176.6 MWoperationalTunica, Mississippi
Robinsonville 230kVJ3175Solar160.0 MWoperationalTunica, Mississippi
Lula-Tunica 115kVJ2432Solar150.0 MWwithdrawnTunica, Mississippi
Banks SS (CE) - Hambrick SS (CE) 115 kVJ2857Solar150.0 MWwithdrawnTunica, Mississippi
Hambrick Switching Station 115kVJ2939Solar150.0 MWwithdrawnTunica, Mississippi
Lula-Tunica (same POI as J1440)J2015Battery90.0 MWwithdrawnTunica, Mississippi
Robinsonville 230kV SubstationJ3177Battery80.0 MWwithdrawnTunica, Mississippi

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.