Bollinger County, Missouri — Interconnection Projects
The interXdata warehouse tracks 7 interconnection projects in Bollinger, Missouri, representing 1,350 MW of requested capacity.
7Total projects
2Active
4Operational
1Withdrawn
1,350 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 5 | 1,000 MW |
| Battery | 2 | 350 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| 7RUSH - 7BALDWIN 345.0kV | J2691 | Solar | 250.0 MW | operational | Bollinger, Missouri |
| Scopus Solar | 68031_SCPSB | Battery | 200.0 MW | active | Bollinger, Missouri |
| St. Francois (Bus #345773) - Lutesville (Bus #344974) 345 kV Line | J2265 | Solar | 200.0 MW | operational | Bollinger, Missouri |
| Scopus Solar | 68031_SCPSR | Solar | 200.0 MW | active | Bollinger, Missouri |
| St. Francois to Lutesville 345 kV | J1519 | Solar | 200.0 MW | operational | Bollinger, Missouri |
| 5HERITAGE - 5FREDTN 161.0kV | J3504 | Solar | 150.0 MW | withdrawn | Bollinger, Missouri |
| 5HERITAGE - 5FREDTN 161.0kV | J3505 | Battery | 150.0 MW | operational | Bollinger, Missouri |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.