Bollinger County, Missouri — Interconnection Projects

The interXdata warehouse tracks 7 interconnection projects in Bollinger, Missouri, representing 1,350 MW of requested capacity.

7Total projects
2Active
4Operational
1Withdrawn
1,350 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar51,000 MW
Battery2350 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
7RUSH - 7BALDWIN 345.0kVJ2691Solar250.0 MWoperationalBollinger, Missouri
Scopus Solar68031_SCPSBBattery200.0 MWactiveBollinger, Missouri
St. Francois (Bus #345773) - Lutesville (Bus #344974) 345 kV LineJ2265Solar200.0 MWoperationalBollinger, Missouri
Scopus Solar68031_SCPSRSolar200.0 MWactiveBollinger, Missouri
St. Francois to Lutesville 345 kVJ1519Solar200.0 MWoperationalBollinger, Missouri
5HERITAGE - 5FREDTN 161.0kVJ3504Solar150.0 MWwithdrawnBollinger, Missouri
5HERITAGE - 5FREDTN 161.0kVJ3505Battery150.0 MWoperationalBollinger, Missouri

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Bollinger County.

Start tracking with interXdata