Butler County, Missouri — Interconnection Projects

The interXdata warehouse tracks 5 interconnection projects in Butler, Missouri, representing 34 MW of requested capacity.

5Total projects
0Active
5Operational
0Withdrawn
34 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas534 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Poplar Bluff Generating Station7392_1Gas7.0 MWoperationalButler, Missouri
Poplar Bluff Generating Station7392_2Gas7.0 MWoperationalButler, Missouri
Poplar Bluff Generating Station7392_3Gas6.7 MWoperationalButler, Missouri
Poplar Bluff Generating Station7392_5Gas6.7 MWoperationalButler, Missouri
Poplar Bluff Generating Station7392_4Gas6.7 MWoperationalButler, Missouri

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Butler County.

Start tracking with interXdata