Holt County, Missouri — Interconnection Projects
The interXdata warehouse tracks 8 interconnection projects in Holt, Missouri, representing 1,349 MW of requested capacity.
8Total projects
0Active
0Operational
8Withdrawn
1,349 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 8 | 1,349 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| SPP Queue Project GEN-2009-012 — Wind in Holt, Missouri | GEN-2009-012 | Wind | 300.0 MW | withdrawn | Holt, Missouri |
| SPP Queue Project GEN-2009-029 — Wind in Holt, Missouri | GEN-2009-029 | Wind | 300.0 MW | withdrawn | Holt, Missouri |
| SPP Queue Project GEN-2010-056 — Wind in Holt, Missouri | GEN-2010-056 | Wind | 151.2 MW | withdrawn | Holt, Missouri |
| Tap Saint Joseph - Cooper 345kV (GEN-2010-056 Tap) | GEN-2013-026 | Wind | 150.0 MW | withdrawn | Holt, Missouri |
| SPP Queue Project GEN-2013-026 — Wind in Holt, Missouri | GEN-2013-026 | Wind | 150.0 MW | withdrawn | Holt, Missouri |
| SPP Queue Project GEN-2009-031 — Wind in Holt, Missouri | GEN-2009-031 | Wind | 149.5 MW | withdrawn | Holt, Missouri |
| Holt County 345kV Substation | GEN-2018-014 | Wind | 74.1 MW | withdrawn | Holt, Missouri |
| SPP Queue Project GEN-2018-014 — Wind in Holt, Missouri | GEN-2018-014 | Wind | 74.1 MW | withdrawn | Holt, Missouri |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-01
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; spp-summary-csv. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Holt County.
Start tracking with interXdata