Tucumcari County, New Mexico — Interconnection Projects

The interXdata warehouse tracks 3 interconnection projects in Tucumcari, New Mexico, representing 186 MW of requested capacity.

3Total projects
0Active
0Operational
3Withdrawn
186 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind2160 MW
Solar126 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Norton 115kV Switching StationGEN-2001-036Wind80.0 MWwithdrawnTucumcari, New Mexico
GEN-2003-003GEN-2003-003Wind80.0 MWwithdrawnTucumcari, New Mexico
Caprock 34.5kVGEN-2012-015Solar26.0 MWwithdrawnTucumcari, New Mexico

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Tucumcari County.

Start tracking with interXdata