The interXdata warehouse tracks 6 interconnection projects in Apache, Oklahoma, representing 475 MW of requested capacity.
6Total projects
0Active
4Operational
2Withdrawn
475 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 6 | 475 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| GEN-2001-035 | GEN-2001-035 | Wind | 149.0 MW | withdrawn | Apache, Oklahoma |
| Washita 138kV | GEN-2003-004 | Wind | 100.0 MW | operational | Apache, Oklahoma |
| GEN-2003-006 | GEN-2003-006 | Wind | 100.0 MW | withdrawn | Apache, Oklahoma |
| Anadarko - Paradise (Blue Canyon) 138kV | GEN-2003-005 | Wind | 99.0 MW | operational | Apache, Oklahoma |
| Washita 138kV | GEN-2004-023 | Wind | 20.6 MW | operational | Apache, Oklahoma |
| Blue Canyon 5 138kV | GEN-2011-037 | Wind | 6.6 MW | operational | Apache, Oklahoma |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.