Kingfisher County, Oklahoma — Interconnection Projects

The interXdata warehouse tracks 12 interconnection projects in Kingfisher, Oklahoma, representing 1,838 MW of requested capacity.

12Total projects
2Active
8Operational
2Withdrawn
1,838 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind41,485 MW
Battery2304 MW
Solar140 MW
Other59 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Spring Creek-Sooner 345kVGEN-2016-119Wind600.0 MWactiveKingfisher, Oklahoma
Red Dirt Wind Project61270_RDDRTWind299.3 MWoperationalKingfisher, Oklahoma
Kingfisher Wind LLC58902_KNG1Wind298.0 MWoperationalKingfisher, Oklahoma
Dover Switchyard 138 kV LineGEN-2016-118Wind288.0 MWoperationalKingfisher, Oklahoma
Dover SW 138 kV SubstationGEN-2024-062Battery230.0 MWwithdrawnKingfisher, Oklahoma
Dover 138 kV Switching StationGEN-2018-011Battery74.1 MWactiveKingfisher, Oklahoma
Lacey 69kVGEN-2017-238Solar40.0 MWwithdrawnKingfisher, Oklahoma
Kingfisher2986_5Other3.1 MWoperationalKingfisher, Oklahoma
Kingfisher2986_3Other2.8 MWoperationalKingfisher, Oklahoma
Kingfisher2986_4Other1.3 MWoperationalKingfisher, Oklahoma
Kingfisher2986_IC1Other1.1 MWoperationalKingfisher, Oklahoma
Kingfisher2986_IC2Other0.8 MWoperationalKingfisher, Oklahoma

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Kingfisher County.

Start tracking with interXdata