Lincoln County, Oklahoma — Interconnection Projects

The interXdata warehouse tracks 4 interconnection projects in Lincoln, Oklahoma, representing 670 MW of requested capacity.

4Total projects
1Active
2Operational
1Withdrawn
670 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar2271 MW
Wind1200 MW
Battery1199 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Riverside - Redbud Switch 345 kV LineGEN-2024-344Wind200.0 MWoperationalLincoln, Oklahoma
Lincoln 138 kV SubstationGEN-2024-245Battery199.0 MWwithdrawnLincoln, Oklahoma
Prague - Chernicky 138 kV LineGEN-2023-210Solar191.0 MWactiveLincoln, Oklahoma
Spring Valley - Warwick 138 kV lineGEN-2024-361Solar80.0 MWoperationalLincoln, Oklahoma

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.