Major County, Oklahoma — Interconnection Projects

The interXdata warehouse tracks 4 interconnection projects in Major, Oklahoma, representing 660 MW of requested capacity.

4Total projects
0Active
1Operational
3Withdrawn
660 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind2430 MW
Solar1150 MW
Battery180 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Maverick Wind Project, LLC63494_GEN1Wind288.0 MWoperationalMajor, Oklahoma
Cleo Corner 138kV substationGEN-2019-061Solar150.0 MWwithdrawnMajor, Oklahoma
Okeene-Cederdale 138 kV LineGEN-2016-107Wind141.8 MWwithdrawnMajor, Oklahoma
Cedardale 138 kV SubstationGEN-2022-064Battery80.0 MWwithdrawnMajor, Oklahoma

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.