Major County, Oklahoma — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in Major, Oklahoma, representing 660 MW of requested capacity.
4Total projects
0Active
1Operational
3Withdrawn
660 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 2 | 430 MW |
| Solar | 1 | 150 MW |
| Battery | 1 | 80 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Maverick Wind Project, LLC | 63494_GEN1 | Wind | 288.0 MW | operational | Major, Oklahoma |
| Cleo Corner 138kV substation | GEN-2019-061 | Solar | 150.0 MW | withdrawn | Major, Oklahoma |
| Okeene-Cederdale 138 kV Line | GEN-2016-107 | Wind | 141.8 MW | withdrawn | Major, Oklahoma |
| Cedardale 138 kV Substation | GEN-2022-064 | Battery | 80.0 MW | withdrawn | Major, Oklahoma |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.