San Juan County, Washington — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in San Juan, Washington, representing 6 MW of requested capacity.
4Total projects
0Active
4Operational
0Withdrawn
6 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Battery | 2 | 4 MW |
| Solar | 2 | 2 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Decatur Island Battery Storage | G0631 | Battery | 2.0 MW | operational | San Juan, Washington |
| Decatur Island Battery Storage | G0631 | Battery | 2.0 MW | operational | San Juan, Washington |
| Decatur Island Solar | G0587 | Solar | 1.0 MW | operational | San Juan, Washington |
| Decatur Island Solar | G0587 | Solar | 1.0 MW | operational | San Juan, Washington |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Orcas Power & Light Cooperative | 2 | 3 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-05
Page data generated2026-08-05
Provenance: bpa-oasis; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.