Burnett County, Wisconsin — Interconnection Projects

The interXdata warehouse tracks 14 interconnection projects in Burnett, Wisconsin, representing 114 MW of requested capacity.

14Total projects
1Active
12Operational
1Withdrawn
114 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas1100 MW
Other119 MW
Solar25 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
MISO Queue Project G222 — Gas in Burnett, WisconsinG222Gas100.0 MWwithdrawnBurnett, Wisconsin
Falun69934_FALUNSolar2.5 MWactiveBurnett, Wisconsin
Viola69495_VIOLASolar2.5 MWoperationalBurnett, Wisconsin
Grantsburg Diesel4021_4Other2.2 MWoperationalBurnett, Wisconsin
Grantsburg Diesel4021_8Other1.8 MWoperationalBurnett, Wisconsin
Grantsburg Diesel4021_3Other1.0 MWoperationalBurnett, Wisconsin
Grantsburg Diesel4021_1AOther0.7 MWoperationalBurnett, Wisconsin
Grantsburg Diesel4021_2Other0.7 MWoperationalBurnett, Wisconsin
Danbury Dam4019_HY3Other0.6 MWoperationalBurnett, Wisconsin
Clam River Dam4018_2Other0.4 MWoperationalBurnett, Wisconsin
Clam River Dam4018_3Other0.4 MWoperationalBurnett, Wisconsin
Clam River Dam4018_1Other0.4 MWoperationalBurnett, Wisconsin
Danbury Dam4019_2Other0.3 MWoperationalBurnett, Wisconsin
Danbury Dam4019_1Other0.1 MWoperationalBurnett, Wisconsin

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.