Green Lake County, Wisconsin — Interconnection Projects

The interXdata warehouse tracks 5 interconnection projects in Green Lake, Wisconsin, representing 322 MW of requested capacity.

5Total projects
0Active
3Operational
2Withdrawn
322 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind1160 MW
Other1160 MW
Gas32 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
MISO Queue Project G376 — Wind in Green Lake, WisconsinG376Wind160.0 MWwithdrawnGreen Lake, Wisconsin
MISO Queue Project G302 — Other in Green Lake, WisconsinG302Other160.0 MWwithdrawnGreen Lake, Wisconsin
Berlin Landfill Gas56069_3Gas0.8 MWoperationalGreen Lake, Wisconsin
Berlin Landfill Gas56069_2Gas0.8 MWoperationalGreen Lake, Wisconsin
Berlin Landfill Gas56069_1Gas0.8 MWoperationalGreen Lake, Wisconsin

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Green Lake County.

Start tracking with interXdata