Green Lake County, Wisconsin — Interconnection Projects
The interXdata warehouse tracks 5 interconnection projects in Green Lake, Wisconsin, representing 322 MW of requested capacity.
5Total projects
0Active
3Operational
2Withdrawn
322 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 1 | 160 MW |
| Other | 1 | 160 MW |
| Gas | 3 | 2 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| MISO Queue Project G376 — Wind in Green Lake, Wisconsin | G376 | Wind | 160.0 MW | withdrawn | Green Lake, Wisconsin |
| MISO Queue Project G302 — Other in Green Lake, Wisconsin | G302 | Other | 160.0 MW | withdrawn | Green Lake, Wisconsin |
| Berlin Landfill Gas | 56069_3 | Gas | 0.8 MW | operational | Green Lake, Wisconsin |
| Berlin Landfill Gas | 56069_2 | Gas | 0.8 MW | operational | Green Lake, Wisconsin |
| Berlin Landfill Gas | 56069_1 | Gas | 0.8 MW | operational | Green Lake, Wisconsin |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Green Lake County.
Start tracking with interXdata