Waukesha County, Wisconsin — Interconnection Projects
The interXdata warehouse tracks 3 interconnection projects in Waukesha, Wisconsin, representing 354 MW of requested capacity.
3Total projects
0Active
2Operational
1Withdrawn
354 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 1 | 350 MW |
| Solar | 2 | 4 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| MISO Queue Project G054 — Other in Waukesha, Wisconsin | G054 | Other | 350.0 MW | withdrawn | Waukesha, Wisconsin |
| Lannon Stone | 67430_1 | Solar | 2.3 MW | operational | Waukesha, Wisconsin |
| Harley-Davison Powertrain Operations | 67382_1 | Solar | 2.2 MW | operational | Waukesha, Wisconsin |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Waukesha County.
Start tracking with interXdata