Barber Pool Hydro, LLC — Interconnection Queue Projects

Barber Pool Hydro, LLC is associated with 1 tracked interconnection projects representing 4 MW of requested capacity.

Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.

1Projects
0Active
1Operational
0Withdrawn
4 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Other14 MW

Geographic footprint

StateProjects
Idaho1

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Barber Dam10735_GEN1Other4.1 MWoperationalAda, Idaho

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.