Big Fork Solar — Interconnection Queue Projects

Big Fork Solar is associated with 2 tracked interconnection projects representing 150 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

2Projects
2Active
0Operational
0Withdrawn
150 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Solar175 MW
Battery175 MW

Geographic footprint

StateProjects
South Carolina2

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Big Fork Solar62184_26Solar74.9 MWactiveBarnwell, South Carolina
Big Fork Solar62184_27Battery74.9 MWactiveBarnwell, South Carolina

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through Big Fork Solar.

Start tracking with interXdata