Chillicothe Municipal Utils (MO) — Interconnection Queue Projects

Chillicothe Municipal Utils (MO) is associated with 7 tracked interconnection projects representing 90 MW of requested capacity.

Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.

7Projects
0Active
7Operational
0Withdrawn
90 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Gas280 MW
Other510 MW

Geographic footprint

StateProjects
Missouri7

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Chillicothe2122_GT2Gas40.0 MWoperationalLivingston, Missouri
Chillicothe2122_GT1Gas40.0 MWoperationalLivingston, Missouri
Chillicothe2122_D5Other2.0 MWoperationalLivingston, Missouri
Chillicothe2122_D4Other2.0 MWoperationalLivingston, Missouri
Chillicothe2122_D3Other2.0 MWoperationalLivingston, Missouri
Chillicothe2122_D2Other2.0 MWoperationalLivingston, Missouri
Chillicothe2122_D1Other2.0 MWoperationalLivingston, Missouri

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through Chillicothe Municipal Utils (MO).