City of New Lisbon (WI) — Interconnection Queue Projects

City of New Lisbon (WI) is associated with 4 tracked interconnection projects representing 8 MW of requested capacity.

Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.

4Projects
0Active
4Operational
0Withdrawn
8 MWRequested capacity
1Markets

Capacity by technology

TechnologyProjectsRequested capacity
Other48 MW

Portfolio by market

MarketProjects
MISO4

Geographic footprint

StateProjects
Wisconsin4

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
New Lisbon4130_5Other2.4 MWoperationalJuneau, Wisconsin
New Lisbon4130_6Other2.3 MWoperationalJuneau, Wisconsin
New Lisbon4130_7Other2.3 MWoperationalJuneau, Wisconsin
New Lisbon4130_2Other1.3 MWoperationalJuneau, Wisconsin

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through City of New Lisbon (WI).

Start tracking with interXdata