City of Vinton - (IA) — Interconnection Queue Projects

City of Vinton - (IA) is associated with 7 tracked interconnection projects representing 18 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

7Projects
0Active
6Operational
0Withdrawn
18 MWRequested capacity
1Markets

Capacity by technology

TechnologyProjectsRequested capacity
Gas516 MW
Other21 MW

Portfolio by market

MarketProjects
MISO7

Geographic footprint

StateProjects
Iowa7

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Vinton1194_8Gas5.6 MWoperationalBenton, Iowa
Vinton1194_7Gas3.7 MWoperationalBenton, Iowa
Vinton1194_9Gas3.0 MWoperationalBenton, Iowa
Vinton1194_6Gas2.5 MWoperationalBenton, Iowa
Vinton1194_1Gas1.3 MWoperationalBenton, Iowa
Vinton1194_10Other0.8 MWoperationalBenton, Iowa
Vinton1194_5Other0.6 MWsuspendedBenton, Iowa

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through City of Vinton - (IA).

Start tracking with interXdata