Colorado Springs Utilities — Interconnection Queue Projects

Colorado Springs Utilities is associated with 2 tracked interconnection projects representing 238 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

2Projects
0Active
2Operational
0Withdrawn
238 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Gas1178 MW
Solar160 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
West Queue Project CSU-2020-2 — Gas in an unlisted county, the U.S.CSU-2020-2Gas178.0 MWoperational
West Queue Project CSU-2018-1 — Solar in an unlisted county, the U.S.CSU-2018-1Solar60.0 MWoperational

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through Colorado Springs Utilities.

Start tracking with interXdata