CPUD — Interconnection Queue Projects
CPUD is associated with 3 tracked interconnection projects representing 550 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
3Projects
1Active
0Operational
2Withdrawn
550 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 450 MW |
| Other | 1 | 100 MW |
Geographic footprint
| State | Projects |
|---|---|
| Washington | 3 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| West Queue Project 1 — Solar in Douglas, Washington | 1 | Solar | 250.0 MW | withdrawn | Douglas, Washington |
| West Queue Project 4 — Solar in Douglas, Washington | 4 | Solar | 200.0 MW | withdrawn | Douglas, Washington |
| West Queue Project 6 — Other in Chelan, Washington | 6 | Other | 100.0 MW | active | Chelan, Washington |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through CPUD.
Start tracking with interXdata