Granite Shore Power is associated with 8 tracked interconnection projects representing 968 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
8Projects
0Active
7Operational
0Withdrawn
968 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 8 | 968 MW |
Geographic footprint
| State | Projects |
|---|---|
| New Hampshire | 8 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Newington | 8002_1 | Other | 414.0 MW | operational | Rockingham, New Hampshire |
| Merrimack | 2364_2 | Other | 345.6 MW | suspended | Merrimack, New Hampshire |
| Merrimack | 2364_1 | Other | 113.6 MW | operational | Merrimack, New Hampshire |
| Schiller | 2367_GT1 | Other | 21.2 MW | operational | Rockingham, New Hampshire |
| Merrimack | 2364_GT2 | Other | 18.6 MW | operational | Merrimack, New Hampshire |
| Merrimack | 2364_GT1 | Other | 18.6 MW | operational | Merrimack, New Hampshire |
| White Lake | 2369_GT1 | Other | 18.6 MW | operational | Carroll, New Hampshire |
| Lost Nation | 2362_GT1 | Other | 18.0 MW | operational | Coos, New Hampshire |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.