Holliday Solar I — Interconnection Queue Projects
Holliday Solar I is associated with 1 tracked interconnection projects representing 74 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
1Projects
1Active
0Operational
0Withdrawn
74 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 1 | 74 MW |
Geographic footprint
| State | Projects |
|---|---|
| South Carolina | 1 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Holliday Solar I | 62229_43 | Solar | 74.0 MW | active | Horry, South Carolina |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Holliday Solar I.
Start tracking with interXdata