KACP — Interconnection Queue Projects

KACP is associated with 1 tracked interconnection projects representing 65 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

1Projects
0Active
1Operational
0Withdrawn
65 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Other165 MW

Geographic footprint

StateProjects
Missouri1

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
GEN-2008-002GEN-2008-002Other65.0 MWoperationalPlatte County, Missouri

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through KACP.