King County Dept-Natural Res - (WA) — Interconnection Queue Projects

King County Dept-Natural Res - (WA) is associated with 2 tracked interconnection projects representing 5 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

2Projects
0Active
2Operational
0Withdrawn
5 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Other25 MW

Geographic footprint

StateProjects
Washington2

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
West Point Treatment Plant50329_4Other2.3 MWoperationalKing, Washington
West Point Treatment Plant50329_5Other2.3 MWoperationalKing, Washington

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through King County Dept-Natural Res - (WA).

Start tracking with interXdata