Milwaukee Metro Sewerage Dist — Interconnection Queue Projects

Milwaukee Metro Sewerage Dist is associated with 9 tracked interconnection projects representing 36 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

9Projects
0Active
9Operational
0Withdrawn
36 MWRequested capacity
1Markets

Capacity by technology

TechnologyProjectsRequested capacity
Gas431 MW
Other55 MW

Portfolio by market

MarketProjects
MISO9

Geographic footprint

StateProjects
Wisconsin9

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
MMSD Jones Island Wastewater54851_GEN1Gas17.5 MWoperationalMilwaukee, Wisconsin
MMSD Jones Island Wastewater54851_SOL3Gas4.6 MWoperationalMilwaukee, Wisconsin
MMSD Jones Island Wastewater54851_SOL2Gas4.6 MWoperationalMilwaukee, Wisconsin
MMSD Jones Island Wastewater54851_SOL1Gas4.6 MWoperationalMilwaukee, Wisconsin
MMSD South Shore Wastewater55525_1Other1.5 MWoperationalMilwaukee, Wisconsin
MMSD South Shore Wastewater55525_2CATOther0.9 MWoperationalMilwaukee, Wisconsin
MMSD South Shore Wastewater55525_3CATOther0.9 MWoperationalMilwaukee, Wisconsin
MMSD South Shore Wastewater55525_4CATOther0.9 MWoperationalMilwaukee, Wisconsin
MMSD South Shore Wastewater55525_1CATOther0.9 MWoperationalMilwaukee, Wisconsin

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through Milwaukee Metro Sewerage Dist.

Start tracking with interXdata