MWEC — Interconnection Queue Projects
MWEC is associated with 2 tracked interconnection projects representing 455 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
2Projects
1Active
1Operational
0Withdrawn
455 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 1 | 255 MW |
| Battery | 1 | 200 MW |
Geographic footprint
| State | Projects |
|---|---|
| North Dakota | 2 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| 115kV Strandahl sub | GEN-2018-067 | Wind | 255.0 MW | active | Williams, North Dakota |
| Pleasant Valley 115 kV Substation | GEN-2024-329 | Battery | 200.0 MW | operational | Williams, North Dakota |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through MWEC.
Start tracking with interXdata