NEETS — Interconnection Queue Projects

NEETS is associated with 1 tracked interconnection projects representing 204 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

1Projects
1Active
0Operational
0Withdrawn
204 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Battery1204 MW

Geographic footprint

StateProjects
Kansas1

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Wolf Creek - Blackberry 345 kV SubstationGEN-2026-SR17Battery204.3 MWactiveSavonburg, Kansas

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through NEETS.

Start tracking with interXdata