REV LNG SSL BC, LLC — Interconnection Queue Projects
REV LNG SSL BC, LLC is associated with 3 tracked interconnection projects representing 5 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
3Projects
0Active
3Operational
0Withdrawn
5 MWRequested capacity
1Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 3 | 5 MW |
Portfolio by market
| Market | Projects |
|---|---|
| PJM | 3 |
Geographic footprint
| State | Projects |
|---|---|
| Pennsylvania | 3 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Towanda Facility | 66393_P105 | Gas | 1.6 MW | operational | Bradford, Pennsylvania |
| Towanda Facility | 66393_P104 | Gas | 1.6 MW | operational | Bradford, Pennsylvania |
| Towanda Facility | 66393_P103 | Gas | 1.6 MW | operational | Bradford, Pennsylvania |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through REV LNG SSL BC, LLC.