TCEC — Interconnection Queue Projects

TCEC is associated with 1 tracked interconnection projects representing 90 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

1Projects
1Active
0Operational
0Withdrawn
90 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Wind190 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Powell Corner 115kV SubstationASGI-2016-010Wind90.0 MWactivePowell Corner 115kV Substation, —

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.