TCEC — Interconnection Queue Projects
TCEC is associated with 1 tracked interconnection projects representing 90 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
1Projects
1Active
0Operational
0Withdrawn
90 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 1 | 90 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Powell Corner 115kV Substation | ASGI-2016-010 | Wind | 90.0 MW | active | Powell Corner 115kV Substation, — |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through TCEC.