TGE Wyoming 225, LLC — Interconnection Queue Projects
TGE Wyoming 225, LLC is associated with 2 tracked interconnection projects representing 565 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
2Projects
2Active
0Operational
0Withdrawn
565 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 1 | 365 MW |
| Battery | 1 | 200 MW |
Geographic footprint
| State | Projects |
|---|---|
| Wyoming | 2 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Cowboy Solar II | 69189_C2PV | Solar | 365.0 MW | active | Laramie, Wyoming |
| Cowboy Solar II | 69189_C2BS | Battery | 200.0 MW | active | Laramie, Wyoming |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through TGE Wyoming 225, LLC.
Start tracking with interXdata