WPEK — Interconnection Queue Projects

WPEK is associated with 3 tracked interconnection projects representing 601 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

3Projects
0Active
0Operational
3Withdrawn
601 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Wind3601 MW

Geographic footprint

StateProjects
Kansas3

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
GEN-2008-060GEN-2008-060Wind300.0 MWwithdrawnEdwards County, Kansas
GEN-2008-049GEN-2008-049Wind200.0 MWwithdrawnCloud County, Kansas
GEN-2008-059GEN-2008-059Wind100.8 MWwithdrawnBarber County, Kansas

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.