WPEK — Interconnection Queue Projects
WPEK is associated with 3 tracked interconnection projects representing 601 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
3Projects
0Active
0Operational
3Withdrawn
601 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 3 | 601 MW |
Geographic footprint
| State | Projects |
|---|---|
| Kansas | 3 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| GEN-2008-060 | GEN-2008-060 | Wind | 300.0 MW | withdrawn | Edwards County, Kansas |
| GEN-2008-049 | GEN-2008-049 | Wind | 200.0 MW | withdrawn | Cloud County, Kansas |
| GEN-2008-059 | GEN-2008-059 | Wind | 100.8 MW | withdrawn | Barber County, Kansas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through WPEK.
Start tracking with interXdata