Yellow Pine Solar II, LLC — Interconnection Queue Projects
Yellow Pine Solar II, LLC is associated with 6 tracked interconnection projects representing 400 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 3 | 250 MW |
| Battery | 3 | 150 MW |
Geographic footprint
| State | Projects |
|---|---|
| Nevada | 6 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Yellow Pine Solar | 66357_YPS1 | Solar | 125.0 MW | operational | Clark, Nevada |
| Yellow Pine II | 67091_YP2BP | Solar | 65.0 MW | operational | Clark, Nevada |
| Yellow Pine Solar | 66357_YPES | Battery | 65.0 MW | operational | Clark, Nevada |
| Yellow Pine II | 67091_YP2AP | Solar | 60.0 MW | operational | Clark, Nevada |
| Yellow Pine II | 67091_YP2AB | Battery | 53.0 MW | operational | Clark, Nevada |
| Yellow Pine II | 67091_YP2BB | Battery | 32.0 MW | operational | Clark, Nevada |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Yellow Pine Solar II, LLC.