CA1 - Spokane — Interconnection Portfolio
CA1 - Spokane is associated with 4 tracked interconnection projects representing 700 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
4Projects
2Active
0Operational
2Withdrawn
700 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Battery | 2 | 350 MW |
| Wind | 1 | 200 MW |
| Solar+Battery | 1 | 150 MW |
Geographic footprint
| State | Projects |
|---|---|
| Washington | 4 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| CA1 - Spokane | CS25-08 | Battery | 250.0 MW | withdrawn | Spokane, Washington |
| CA1 - Spokane | CS25-17 | Wind | 200.0 MW | active | Spokane, Washington |
| CA1 - Spokane | CS25-10 | Solar+Battery | 150.0 MW | withdrawn | Spokane, Washington |
| CA1 - Spokane | CS25-03 | Battery | 100.0 MW | active | Spokane, Washington |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Monitor CA1 - Spokane's portfolio across all markets.
Start tracking with interXdata