CA1 - Spokane (CS25-08)

CA1 - Spokane is a 250.0 MW battery interconnection project in Spokane, Washington with a current status of withdrawn. It is proposed to connect at Boulder 230kV Station.

250.0 MWCapacity
WithdrawnStatus
WAMarket
BatteryTechnology

Project facts

Canonical nameCA1 - Spokane
Queue IDCS25-08
Statuswithdrawn
Source statusWithdrawn
MarketWA
TechnologyBattery
Capacity250.0 MW
StateWashington
CountySpokane
Point of interconnectionBoulder 230kV Station
Requested (queue) date2025-04-30
Proposed in-service date2029-05-04
Operational date—
Withdrawn date—
DeveloperCA1 - Spokane
Utility / transmission ownerAvista Utilities

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata