Ft Meade Solar, LLC — Interconnection Portfolio

Ft Meade Solar, LLC is associated with 2 tracked interconnection projects representing 150 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

2Projects
0Active
0Operational
2Withdrawn
150 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Solar2150 MW

Geographic footprint

StateProjects
Florida2

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Southeast Queue Project 272 — Solar in Polk, Florida272Solar74.8 MWwithdrawnPolk, Florida
Ft Meade Solar, LLC054822Solar74.8 MWwithdrawnPolk, Florida

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: duke-def-oasis; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Monitor Ft Meade Solar, LLC's portfolio across all markets.

Start tracking with interXdata