Glen Geyer Electric — Interconnection Portfolio
Glen Geyer Electric is associated with 5 tracked interconnection projects representing 0 MW of requested capacity.
Entity resolution: this developer rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
5Projects
0Active
5Operational
0Withdrawn
0 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 5 | 0 MW |
Geographic footprint
| State | Projects |
|---|---|
| California | 5 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| SDG&E DG SDGE-INT-108787 | SDGE-INT-108787 | Solar | 0.0 MW | operational | San Diego, California |
| SDG&E DG SDGE-INT-105605 | SDGE-INT-105605 | Solar | 0.0 MW | operational | San Diego, California |
| SDG&E DG SDGE-INT-110716 | SDGE-INT-110716 | Solar | 0.0 MW | operational | San Diego, California |
| SDG&E DG SDGE-INT-100912 | SDGE-INT-100912 | Solar | 0.0 MW | operational | San Diego, California |
| SDG&E DG SDGE-INT-103420 | SDGE-INT-103420 | Solar | 0.0 MW | operational | San Diego, California |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: ca-dgstats. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Monitor Glen Geyer Electric's portfolio across all markets.
Start tracking with interXdata