California Interconnection Projects
interXdata tracks 51,366 interconnection projects in California representing 836,642 MW of requested capacity. The dominant technology by capacity is Battery. The most active counties are San Diego, Los Angeles, Santa Clara.
51,366Total projects
662Active
48,389Operational
2,219Withdrawn
836,642 MWRequested capacity
153,259 MWActive capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Battery | 1,415 | 233,404 MW |
| Solar+Battery | 660 | 186,789 MW |
| Gas | 1,217 | 141,744 MW |
| Solar | 46,648 | 135,571 MW |
| Wind | 526 | 87,127 MW |
| Other | 855 | 27,793 MW |
| Wind+Battery | 7 | 8,825 MW |
| Gas+Battery | 14 | 5,480 MW |
| Other Storage | 6 | 3,496 MW |
| Offshore Wind | 2 | 2,412 MW |
| Hydro | 4 | 1,304 MW |
| Solar+Wind+Battery | 3 | 1,014 MW |
| Geothermal | 6 | 890 MW |
| Hydrogen | 2 | 692 MW |
| Solar+Gas | 1 | 100 MW |
Counties
| County | Projects | Requested capacity |
|---|---|---|
| San Diego | 9,559 | 34,470 MW |
| Los Angeles | 4,211 | 67,533 MW |
| Santa Clara | 3,120 | 6,729 MW |
| Riverside | 2,612 | 66,126 MW |
| Alameda | 2,463 | 12,705 MW |
| Orange | 2,349 | 9,898 MW |
| Contra Costa | 2,131 | 15,643 MW |
| Fresno | 2,010 | 45,537 MW |
| Sonoma | 1,800 | 3,215 MW |
| San Bernardino | 1,616 | 73,031 MW |
| Kern | 1,486 | 105,994 MW |
| Santa Cruz | 1,338 | 421 MW |
| San Mateo | 1,321 | 1,260 MW |
| San Francisco | 1,297 | 545 MW |
| Marin | 1,223 | 801 MW |
| Placer | 1,003 | 2,813 MW |
| San Luis Obispo | 908 | 29,535 MW |
| San Joaquin | 851 | 15,371 MW |
| Ventura | 730 | 7,565 MW |
| El Dorado | 682 | 943 MW |
| Yolo | 613 | 1,204 MW |
| Tulare | 523 | 9,231 MW |
| Solano | 514 | 10,947 MW |
| Santa Barbara | 513 | 1,760 MW |
| Nevada | 502 | 114 MW |
| Butte | 494 | 2,574 MW |
| Monterey | 460 | 7,825 MW |
| Napa | 409 | 641 MW |
| Kings | 366 | 18,746 MW |
| Mendocino | 363 | 347 MW |
| Humboldt | 351 | 4,579 MW |
| Madera | 341 | 3,249 MW |
| Shasta | 322 | 3,935 MW |
| Lake | 253 | 676 MW |
| Merced | 243 | 11,487 MW |
| Imperial | 217 | 24,780 MW |
| Stanislaus | 192 | 5,415 MW |
| Calaveras | 189 | 1,333 MW |
| Tuolumne | 168 | 1,191 MW |
| Yuba | 157 | 1,006 MW |
Largest projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Cuatro Vientos | caiso_c15_465 | Wind+Battery | 3,526.0 MW | withdrawn | California |
| Chokecherry and Sierra Madre Wind Energy Project | caiso_c15_426 | Wind | 3,290.0 MW | withdrawn | California |
| Ventura Wind | caiso_c15_463 | Wind | 2,482.0 MW | withdrawn | California |
| Monterey Wind | caiso_c15_462 | Wind | 2,462.0 MW | withdrawn | California |
| Oaks Wind | caiso_c15_461 | Wind | 2,460.0 MW | withdrawn | California |
| Charlie Wind | caiso_c15_460 | Wind | 2,460.0 MW | withdrawn | California |
| GEMINI WIND NORTH | 1474 | Wind | 2,005.8 MW | withdrawn | N/a, California |
| ALAMITOS ENERGY CENTER | 939 | Gas | 1,902.9 MW | withdrawn | Los Angeles, California |
| Ethan Creek | caiso_c15_534 | Wind | 1,870.0 MW | withdrawn | California |
| EDGEWOOD SOLAR HYBRID | 1715 | Solar+Battery | 1,700.0 MW | withdrawn | Fresno, California |
| CA Queue Project 220620000000 — Solar+Battery in San Bernardino, California | 220620000000 | Solar+Battery | 1,650.0 MW | active | San Bernardino, California |
| West Queue Project Q92 — Solar+Battery in San Bernardino, California | Q92 | Solar+Battery | 1,650.0 MW | active | San Bernardino, California |
| EMPIRE | 2030 | Battery | 1,600.0 MW | withdrawn | San Bernadino, California |
| Gema Hybrid | caiso_c15_275 | Solar+Battery | 1,546.0 MW | withdrawn | California |
| Two Bunch Palms | caiso_c15_214 | Battery | 1,518.0 MW | withdrawn | California |
| INTREPID ENERGY | 1692 | Wind | 1,500.1 MW | withdrawn | Humboldt, California |
| ISLAY | 1998 | Wind | 1,500.0 MW | withdrawn | San Luis Obispo, California |
| West Queue Project Q98 — Solar+Battery in Los Angeles, California | Q98 | Solar+Battery | 1,500.0 MW | active | Los Angeles, California |
| PINEBROOK SOLAR HYBRID ENERGY CENTER | 1581 | Solar+Battery | 1,500.0 MW | withdrawn | Fresno, California |
| TEMPEST GENERATION | 1559 | Wind | 1,500.0 MW | withdrawn | Humboldt, California |
| HOLMAN | 1889 | Wind | 1,500.0 MW | active | Monterey, California |
| NIMITZ 1 GENERATION | 1589 | Wind | 1,500.0 MW | withdrawn | San Luis Obispo, California |
| SEAWOLF GENERATION | 1600 | Wind | 1,500.0 MW | withdrawn | San Luis Obispo, California |
| NIMITZ 2 GENERATION | 1590 | Wind | 1,500.0 MW | withdrawn | San Luis Obispo, California |
| CA Queue Project 230320000002 — Solar+Battery in Los Angeles, California | 230320000002 | Solar+Battery | 1,500.0 MW | active | Los Angeles, California |
| VINSON ENERGY | 1747 | Wind | 1,499.9 MW | withdrawn | San Luis Obispo, California |
| EAGLE MOUNTAIN PUMP STORAGE #4 | 1193 | Battery | 1,408.0 MW | withdrawn | Riverside, California |
| ETERNAL 2 | 2050 | Battery | 1,400.0 MW | withdrawn | Riverside, California |
| LIGHTHOUSE WIND | 1738 | Wind | 1,400.0 MW | withdrawn | San Luis Obispo, California |
| ETERNAL PUMPED STORAGE | 1759 | Battery | 1,400.0 MW | withdrawn | Riverside, California |
Top developers in California
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| SolarCity | 3,377 | 26 MW |
| SunPower | 3,216 | 86 MW |
| Solar City | 1,951 | 13 MW |
| REC Solar, Inc. | 1,481 | 16 MW |
| Sun Light and Power | 1,191 | 7 MW |
| Akeena Solar | 1,172 | 8 MW |
| Sunrun Inc. | 923 | 5 MW |
| Real Goods | 821 | 6 MW |
| Baker Electric, Inc. | 789 | 6 MW |
| PowerLight Corporation | 639 | 5 MW |
| Regrid Power, Inc. | 627 | 3 MW |
| Semper Solaris Construction Inc | 600 | 3 MW |
| Borrego Solar Systems, inc. | 517 | 11 MW |
| SPG Solar, Inc. | 508 | 14 MW |
| VERENGO | 502 | 2 MW |
Recent material changes
| Observed | Project | Field | Old | New |
|---|---|---|---|---|
| 2026-10-08 | JEWELFLOWER STORAGE | status | active | withdrawn |
| 2026-10-08 | JEWELFLOWER STORAGE | withdrawn_date | — | 2026-10-06 |
| 2026-10-02 | Jasmine | proposed_online_date | 2027-05-01 | 2027-12-01 |
| 2026-10-02 | Jasmine | proposed_online_date | 2027-05-01 | 2027-12-01 |
| 2026-10-02 | AB Van Nuys | proposed_online_date | 2027-03-01 | 2027-12-01 |
| 2026-10-02 | Ameresco Ox Mountain | proposed_online_date | 2026-12-01 | 2027-09-01 |
| 2026-10-02 | San Pedro Public Market (SPPM) | proposed_online_date | 2027-03-01 | 2027-06-01 |
| 2026-10-02 | Fordyce - SLLAX680 | proposed_online_date | 2027-03-01 | 2027-06-01 |
| 2026-10-02 | East Road Storage Project | proposed_online_date | 2027-02-01 | 2027-06-01 |
| 2026-10-02 | East Road Storage Project | capacity_mw | 1.5 | 1 |
| 2026-10-02 | San Leandro 10 - sleba702 | proposed_online_date | 2027-01-01 | 2027-05-01 |
| 2026-10-02 | South Bay Dis Ctr 6-SLLAX680 | proposed_online_date | 2027-03-01 | 2027-05-01 |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-10-11
Page data generated2026-10-11
Provenance: bpa-oasis; ca-dgstats; California ISO — public interconnection queue; U.S. EIA — Form EIA-860M generator inventory (operating + planned); iid-queue; ladwp-oasis; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; nvenergy-oasis; pacificorp-oasis; wapa-dsw-oasis; wapa-sn-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get notified when a new project appears in California.
Start tracking with interXdata