Tasco Engineering, Inc. — Interconnection Portfolio
Tasco Engineering, Inc. is associated with 1 tracked interconnection projects representing 2 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
1Projects
0Active
0Operational
1Withdrawn
2 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 1 | 2 MW |
Geographic footprint
| State | Projects |
|---|---|
| Oregon | 1 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| West Queue Project 164-B — Wind in Clatsop, Oregon | 164-B | Wind | 1.7 MW | withdrawn | Clatsop, Oregon |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Monitor Tasco Engineering, Inc.'s portfolio across all markets.
Start tracking with interXdata