SPP Interconnection Queue

The Southwest Power Pool (SPP) administers the interconnection queue across the central Great Plains, from the Dakotas to Oklahoma.

The interXdata canonical warehouse currently tracks 10 interconnection requests in the SPP footprint, representing 3,409 MW of requested capacity. Of these, 4 are active and 1 have reached commercial operation.

10Total projects
4Active
1Operational
5Withdrawn
0Suspended
269 MWActive capacity

Capacity by technology

TechnologyProjectsRequested capacity
Coal32,500 MW
Solar+Battery1400 MW
Battery1250 MW
Wind4209 MW
Gas150 MW

Queue intake by request year

Request yearProjectsRequested capacity
20254269 MW
20231400 MW
20171190 MW
20041900 MW
2003150 MW
200121,600 MW

Largest active projects

ProjectQueue IDTechnologyCapacityStatusLocation
SPP Queue Project GEN-2024-328 — Battery in Slope, North DakotaGEN-2024-328Battery250.0 MWactiveSlope, North Dakota
SPP Queue Project GEN-2025-GR4 — Wind in Aurora, South DakotaGEN-2025-GR4Wind10.8 MWactiveAurora, South Dakota
SPP Queue Project GEN-2025-GR5 — Wind in Ward, North DakotaGEN-2025-GR5Wind7.7 MWactiveWard, North Dakota
SPP Queue Project GEN-2025-GR3 — Wind in Mclean, North DakotaGEN-2025-GR3Wind0.0 MWactiveMclean, North Dakota

Most active developers

Developer attribution is not yet resolved for this set.

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Methodology & sources

Counts aggregate current canonical project records whose market region is SPP. Status is normalized to a five-value vocabulary (active, operational, withdrawn, suspended, unknown). Capacity is the primary requested MW per project. Withdrawn and operational projects are retained as historical records.

Source last checked2026-07-31
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Receive a weekly summary of new, withdrawn, and materially changed projects in SPP.