SPP Queue Project GEN-2025-GR4 — Wind in Aurora, South Dakota

SPP Queue Project GEN-2025-GR4 — Wind in Aurora, South Dakota is a 10.8 MW wind interconnection project in Aurora, South Dakota with a current status of active. It is proposed to connect at Wessington Springs.

10.8 MWCapacity
ActiveStatus
SPPMarket
WindTechnology

Project facts

Canonical nameSPP Queue Project GEN-2025-GR4 — Wind in Aurora, South Dakota
Queue IDGEN-2025-GR4
Statusactive
Source statusactive
MarketSPP
TechnologyWind
Capacity10.8 MW
StateSouth Dakota
CountyAurora
Point of interconnectionWessington Springs
Requested (queue) date2025-10-06
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-10-11

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.